China js3000 concrete mixer shall provide cast-in-place concrete to the construction site in the form of centralized pre-mixing and long-distance transportation. This is a kind of high-tech building materials product which combines modern concrete with modern building technology. Modern buildings, highways, railways, Bridges, airports and so on are inseparable from the concrete pouring, so the concrete mixing plant has become a hot product in these industries.
It is well known that China js1000 concrete mixers are used outdoors and are exposed to wind, sun and rain all year round. What if regular maintenance and maintenance can extend the service life of the equipment? Js1000 concrete mixer manufacturers said.
1. The concrete mixer cleaned the inside and outside of the mixing drum, drained the door, etc., and washed it with water. Improperly cleaned adhesives should be removed periodically. Tighten the mixing blades once a week to prevent them from falling and causing accidents.
2. China js3000 concrete mixerchecks the shaft end seal chamber, the inlet and outlet of the distributor, whether the seal line is smooth, whether it is full of grease and whether there is enough grease at each lubrication point and gearbox. Observe whether the grease in the storage cylinder of each electric lubricating pump is used up. After use should be timely filled, not allowed to run without oil.
Reason For Low Rfficiency Of Concrete Mixer
1. Preparation time is longer than stirring and discharging time. Since the preparation of various raw materials needs to be completed after the completion of preparation, in this case, there is a large amount of free time in the whole process, which can only wait for the preparation, which greatly reduces the workload and the efficiency of each workflow. Unable to complete the corresponding workload.
2. The preparation time is less than or equal to the sum of the two. In the process of concrete production, the calculation of work efficiency is relatively large, that is to say, the total production time is too long, will destroy the production balance of the whole concrete, the work efficiency is low.
Often, too much time is wasted in the preparation phase, which means that the material is weighed or transported too long. Usually, due to its particularity, such as gravel and pebbles material is difficult to transport to China js1000 concrete mixer, so during this time weighing cement, curing agent and the liquid takes a long time, and may terminate transportation, gravel and pebbles can according to the standard time to weigh and directly determine the efficiency of the concrete mixing station on the mode of transportation. In practice, we can control the speed of weighing tools so that the transportation equipment can greatly increase the transportation workload, which is very beneficial to reduce the transportation time of sand and stone. These are the reasons why china js1000 concrete mixers are inefficient.